Lightweight & Easy to Handle

No tools, bolts, screws or moving parts

One Kit, Many Layouts

Create tiering risers and staging

Safe & Strong

Tested to 7.5kN/m2

Reversible Decks

Add a different finish to one side

Guaranteed For 15 Years

Built to last

Accessories Available

Safety rails, bridge decks, fascias and skirting

Q-plus tiering is designed for seated audiences (providing sufficient legroom). However, it can also be used for standing audiences or performers.

The system can be designed for very large layouts which can extend around corners, either square or rounded, ideal for sports halls, sports venues or Leisure Centres.

This strong, stable and lightweight tiered solution is quick to build without the need for tools. The system has been designed with space-saving in mind and has a compact stacking and storage system, so you can use it for events and neatly store your staging away in between. 

Easily created from exchangeable frames and decks, Q-plus can be built as a riser or stage. We can achieve heights of 4.5 metres high with bracing which allows for excellent acoustics if used for choir/choral performances. The same equipment can be used for staging allowing for more flexibility which enables you to get multiple uses out of your staging. Create multiple layouts from just one piece of kit.

What’s Included?

  • Decks
  • Frame
  • Step(s)
  • Storage Trolley
  • Tie Plates And Bungs
  • Optional Accessories

Q-plus is perfect for:

  • Orchestras and music recitals
  • Spectators/audiences
  • Choral groups
  • Schools
  • Churches and cathedrals
  • Colleges and universities
  • Village halls
  • Community groups
  • Commercial events

Q-plus Care and Maintenance Instructions

In light of the Covid-19 pandemic, we have made important changes to our products in order to make them as hygienic as possible when being used and stored. The lacquer in which our Q-plus deck panels are sprayed now contains a new Bio+Coat slip-resistant antibacterial layer. Further information on this can be found here.

It is recommended that the staging is fully cleaned after every use with weak soapy water (ensure the soap does not contain any bleaching agents) and a damp cloth. Do not soak the decks. Allow them to dry fully in the open-air before stacking.

Use an antibacterial spray or household detergent to wipe or spray the metal frames. Also, allow these to air-dry fully before stacking.

The flexible nature of our Q-plus kits means that it is very easy to store after use. Always stack the decks horizontally, as shown below, and store inside in a clean, dry environment.

    Get A Quote

    Leave your details and we'll be back in touch within 24 hours.





    [anr_nocaptcha g-recaptcha-response]
    I consent to Stage Systems storing my submitted details for enquiry purposes.